 On this page we log the amount of SPIRou time allocated by the TACs (SLS and A&​B-rated PI programmes) and scheduled on the telescope since the beginning of semester 2019a, comparing both to those of the other CFHT instruments (all numbers taken from [[http://​www.cfht.hawaii.edu/​en/​science/​QSO/​|CFHT QSO pages]]). ​ We quantify the **overall time pressure** on each instrument by computing the **difference between the allocated and scheduled amounts** since 2019a. ​ (We recall that 1 night of telescope time amounts to 7 hr for SPIRou, 5.5 hr for MegaCam, 7.5 hr for ESPaDOnS, 5 hr for WIRCAM and 6.5 hr for SITELLE).  ​ On this page we log the amount of SPIRou time allocated by the TACs (SLS and A&​B-rated PI programmes) and scheduled on the telescope since the beginning of semester 2019a, comparing both to those of the other CFHT instruments (all numbers taken from [[http://​www.cfht.hawaii.edu/​en/​science/​QSO/​|CFHT QSO pages]]). ​ We quantify the **overall time pressure** on each instrument by computing the **difference between the allocated and scheduled amounts** since 2019a. ​ (We recall that 1 night of telescope time amounts to 7 hr for SPIRou, 5.5 hr for MegaCam, 7.5 hr for ESPaDOnS, 5 hr for WIRCAM and 6.5 hr for SITELLE).  ​
  
-Following the various technical operations (aluminizing,​ engineering),​ issues (crane, hydraulics) and shutdowns (TMT protests, COVID-19) that CFHT underwent since 2019a (generating an overall loss of 126 nights),​ only MegaCam was scheduled enough time on the telescope to carry out the allocated programmes. ​ **SPIRou suffered a lot from these issues**, with a cumulated allocated minus scheduled time deficit **reaching ​5.6 nights since 2019a**, i.e., 20.9 nights larger than that of the other main CFHT instrument MegaCam.  ​+Following the various technical operations (aluminizing,​ engineering),​ issues (crane, hydraulics) and shutdowns (TMT protests, COVID-19) that CFHT underwent since 2019a (generating an overall loss of 126 nights),​ only MegaCam was scheduled enough time on the telescope to carry out the allocated programmes. ​ **SPIRou suffered a lot from these issues**, with a cumulated allocated minus scheduled time deficit **reaching ​4.6 nights since 2019a**, i.e., 19.9 nights larger than that of the other main CFHT instrument MegaCam.  ​
  
 ===== Overall pressure = allocated time - scheduled time (higher numbers meaning stronger pressure, in nights) ===== ===== Overall pressure = allocated time - scheduled time (higher numbers meaning stronger pressure, in nights) =====
Line 13: Line 13:
 | 2020b |-3.58|-14.63|2.68|3.09|-0.24| | 2020b |-3.58|-14.63|2.68|3.09|-0.24|
 | 2021a |-7.19|-14.02|-0.45|2.40|-0.18| | 2021a |-7.19|-14.02|-0.45|2.40|-0.18|
-| 2021b |-5.91|-4.44|-2.03|0.00|-1.54| +| 2021b |-6.91|-4.44|-1.03|0.00|-1.54| 
-| **total** |**5.60**|-15.26|6.05|27.95|0.73|+| **total** |**4.60**|-15.26|7.05|27.95|0.73|
  
 ===== Allocated time by TACs & DDT (LPs and A&​B-rated PI programmes, in nights) ===== ===== Allocated time by TACs & DDT (LPs and A&​B-rated PI programmes, in nights) =====
Line 35: Line 35:
 | 2020b |72.5|47|18|17|22|7.5| | 2020b |72.5|47|18|17|22|7.5|
 | 2021a |62|84|13|13|9|0| | 2021a |62|84|13|13|9|0|
-| 2021b |90|45|22|8|18|1| +| 2021b |91|45|21|8|18|1| 
-| **total** |**387**|340|85|76|81|127|+| **total** |**388**|340|84|76|81|127|
  
  
sls/scheduling.txt · Last modified: 2021/08/30 19:54 by jdonati