 ====== SPIRou scheduling at CFHT ====== ​ ====== SPIRou scheduling at CFHT ====== ​
  
-On this page we log the amount of SPIRou time allocated by the TACs (SLS/SPICE and A&​B-rated PI programmes) and scheduled on the telescope since the beginning of semester 2019a, comparing both to those of the other CFHT instruments (all numbers taken from [[http://​www.cfht.hawaii.edu/​en/​science/​QSO/​|CFHT QSO pages]]). ​ We quantify the **overall time pressure** on each instrument by computing the **difference between the allocated and scheduled amounts** since 2019a. ​ (We recall that 1 night of telescope time amounts to 7 hr for SPIRou, ​5.5 hr for MegaCam (5 hr ​from 2022b), 7.5 hr for ESPaDOnS, 5 hr for WIRCAM and 6.5 hr for SITELLE).  ​+On this page we log the amount of SPIRou time allocated by the TACs (SLS/SPICE/​PLANETS ​and A&​B-rated PI programmes) and scheduled on the telescope since the beginning of semester 2019a, comparing both to those of the other CFHT instruments (all numbers taken from [[http://​www.cfht.hawaii.edu/​en/​science/​QSO/​|CFHT QSO pages]]). ​ We quantify the **overall time pressure** on each instrument by computing the **difference between the allocated and scheduled amounts** since 2019a. ​ (We recall that 1 night of telescope time amounts to 7 hr for SPIRou, 5 hr for MegaCam (5.5 hr up to 2022a), 7.5 hr for ESPaDOnS, 5 hr for WIRCAM and 6.5 hr for SITELLE).  ​
  
 Following the various technical operations (aluminizing,​ engineering),​ issues (crane, hydraulics, mirror support) and shutdowns (TMT protests, COVID-19) that CFHT underwent since 2019a (generating an overall loss of 126 nights),​ only MegaCam was scheduled enough time on the telescope to carry out the allocated programmes until late 2023, when a crane problem prevented MegaCam and WIRCAM to be mounted on the telescope for several months. ​ (We recall that in average, CFHT is meant to schedule time for each instrument in proportion to the allocated time).  ​ Following the various technical operations (aluminizing,​ engineering),​ issues (crane, hydraulics, mirror support) and shutdowns (TMT protests, COVID-19) that CFHT underwent since 2019a (generating an overall loss of 126 nights),​ only MegaCam was scheduled enough time on the telescope to carry out the allocated programmes until late 2023, when a crane problem prevented MegaCam and WIRCAM to be mounted on the telescope for several months. ​ (We recall that in average, CFHT is meant to schedule time for each instrument in proportion to the allocated time).  ​
Line 19: Line 19:
 | 2023b |-17.27|15.77|-18.05|5.36|-0.07| | 2023b |-17.27|15.77|-18.05|5.36|-0.07|
 | 2024a |-23.69|16.34|3.08|6.06|-16.02| | 2024a |-23.69|16.34|3.08|6.06|-16.02|
-| **total** |**-48.35**|5.80|-22.07|37.41|-19.60|+| 2024b |-2.20|-8.84|-0.69|-1.93|-1.55| 
 +| 2025a |-3.83|-7.52|-1.17|-0.35|-1.55| 
 +| **total** |**-54.38**|-10.56|-23.93|35.13|-22.70|
  
 ===== Allocated time by TACs & DDT (LPs and A&​B-rated PI programmes, in nights) ===== ===== Allocated time by TACs & DDT (LPs and A&​B-rated PI programmes, in nights) =====
Line 35: Line 37:
 | 2023b |86.73 (59.53)|43.77 |13.95|11.36|13.93| | 2023b |86.73 (59.53)|43.77 |13.95|11.36|13.93|
 | 2024a |64.31 (42.01)|85.34 | 3.08|10.06|4.98| | 2024a |64.31 (42.01)|85.34 | 3.08|10.06|4.98|
-| **total** |**706.65 (484.26)**|652.80|168.93|155.41|139.40|+| 2024b |69.80 (39.37)|41.16 |12.31|21.07|24.45| 
 +| 2025a |69.17 (60.00)|70.48|3.83|9.65|13.45| 
 +| **total** |**845.62 (583.63)**|764.44|185.07|186.13|177.30|
  
 ===== Scheduled time on CFHT & time lost to technical issues, engineering & shutdowns (in nights) ===== ===== Scheduled time on CFHT & time lost to technical issues, engineering & shutdowns (in nights) =====
Line 51: Line 55:
 | 2023b |104|28|31|6|14|0| | 2023b |104|28|31|6|14|0|
 | 2024a |88|69|0|4|21|0| | 2024a |88|69|0|4|21|0|
-| **total** |**755**|647|191|118|159|138| +| 2024b |72|50|13|23|26|0| 
 +| 2025a |73|78|5|10|15|10|  
 +| **total** |**900**|775|209|151|200|138| 
  